A CNC router controller needs its BGA off, and the technician — fresh from the reballing chapter's package work — sets up exactly as that chapter taught: package-focused, cradle staged, budget log open, straight to heat. The board sits bare on the mat, neighborhood unshielded, no preheater in sight. What does the section reorder?
Select one answer.
Only the preheater — the reballing setup transfers to mounted work once board-level preheat is added, since the shield question resolves itself with a package-matched nozzle. Nozzle matching is the shield question's modern answer, the reason dedicated reballing benches carry a nozzle per package family and shield tape mostly for legacy work. Legacy work aside, the tape drawer mostly documents history. Only the sequence — the same setup works if heat comes up slowly, giving the neighborhood time to shed the spill a fast climb would concentrate. The cradle's position — mounted removals stage the landing on the board's far side, away from the nozzle's retreat path, the layout detail package work never teaches. The whole frame: the board is the patient now. Package chapters priced the package; a mounted board carries the value, the data, and a hundred bystanders — so the shield map is planned and laid cold, the board seats on mandatory preheat before any top-side heat, and the package's survival becomes the bonus, not the goal. The reballing setup wasn't wrong; it was for a different patient.